The project involves the construction and completion of three classrooms on the ground floor of a single-storey building at St. Augustine Preparatory School. The scope includes:
- Construction of the ground floor classrooms with reinforced concrete walls, flooring, and roofing.
- Provision of a reinforced concrete slab designed to support a future first floor.
- Construction of a staircase to provide access to the planned first floor.
- Finishing works including plastering, painting, and installation of doors and windows.
- Compliance with safety and building standards to ensure a durable and functional learning environment.
The project aims to expand the school’s capacity, provide modern and safe learning spaces, and allow for future vertical expansion with the first floor.